|
|
| Home | Profile | Products | Testimonials | News Coverage | Contact Us |
![]()
![]()
|
The KRE fully Automatic Train Washing System (Model KRE-TRAIN WASH-1) is designed for washing trains with their own means of locomotion on tracks at a maximum speed of 5 Km/hr. This is a 4 Brush Station Plant.
The operation of the system is automatic. All devices are started by means of photocells placed in positions that allow a satisfactory performance of each cycle in order to turn on / off all devices.
All operation of the system are controlled and monitored by PLC (Programmable Logic Controller)
|
|
|
The KRE fully Automatic Train Washing System is designed for washing trains with their own means of locomotion on tracks at a maximum speed of 5 km/hr. This is a 4 brush station plant. The operation of the system is automatic. All devices are started by means of photocells placed in positions that allow a satisfactory performance of each cycle in order to turn on /off all devices. All operations of the system are controlled and monitored by PLC (programmable logic controller) |
|
K. R. Equipments Pvt. Ltd. Mr. Vijay Raghavan (General Manager) No. 42/33, Site - 4, Industrial Area Sahibabad - 201 010, Uttar Pradesh, India |
| Contact via E-mail | Contact via SMS |
© K. R. Equipments Pvt. Ltd.. All Rights Reserved (Terms of Use)
Developed and Managed by
IndiaMART InterMESH Limited